Date | Finished projects | Characteristics |
---|---|---|
2014 | Commissioning of the 420-MW Power Unit No.4 of the Cherepovets State District Power Plant (SDPP) | Siemens AG SCC5 4000FSS Power unit: Gas turbine SGT5-4000F; steam turbine SST5-3000 Generator SGen5-2000H
Heat recovery boiler Ep-270/316/46-12.5/3.06/0.46-560/560/237 |
2015 | Commissioning of MOSENERGO 220 MW CHPP-12 | 220 MW CCGT unit (PGU-220T); 160 MW gas-turbine power plant (GTE-160); Gas turbine Т-56/73-7.8/0.04; Air-cooled generators TZFG-160-2MUZ, completely air-cooled generators TZFP-80-2UZ;
Heat recovery boiler PK-74. |
2015 | Commissioning of the 420 MW Power Unit No.9 of the Serov State District Power Plant (SDPP) | Siemens AG SCC5 4000FSS Power unit: Gas turbine SGT5-4000F; steam turbine SST5-3000 Generator SGen5-2000H
Heat recovery boiler Ep-270/316/46-12.5/3.06/0.46-560/560/237 |
2016 | Commissioning of the 410 MW Novo-Salavatskaya CCGT | Power unit (Siemens): Gas turbine SGT5-4000F; steam turbine SST5-5000 Generators SGen5-1000A, SGen5-100A-2P
Heat recovery boiler Ep-264/297/43-13.0/3.0/0.47-558/558/237 |
2016 | 100 MW Power Plant PP-1 of the Central CHPP | CHPP gas-turbine unit: 2 gas turbines SGT800 2 generators AMS-1250ALL 4LBS
2 hot-water heat recovery boilers KUV-69.5/170 |