Active projects

Amur TPP

Term of the project: 2023 y

Provision of reliable power supply to the largest industrial enterprises of the region: Amur MCC; Amur Gas Processing Plant.

Groznenskaya TPP

Term of the project: 2018

Two GTU power units based on Siemens SGT5-PAC-2000E gas turbine units of installed capacity 346 МВт.
The scheme of power output of the power station on the basis of the equipment of the open switchgear is realized.